The house is really starting to take shape.
The opening in the floor here is where the stairs will go.
Above looks towards the back bedroom. The first truss is a girder truss which will carry some of the main room roof load. Beyond that first girder are attic trusses. There's not much headroom up there, but enough to put our mechanical equipment for our ducted mini-split and a little extra storage. I had the truss manufacturer add depth in the truss above the attic space so that we can easily put insulation in the roof. The attic will actually be conditioned space which means that our attic will also have drywall on the ceiling and walls.
Our skylight in the shower will be going above where Neil is standing.