Wednesday, March 5, 2014
gutter choices
Sunday, March 2, 2014
construction update
We are moving right along. Exterior framing is done and the roof is in the process of being installed.

The kitchen is to the right and dining to the left leading out to the deck.


The light gray material is TPO which is a thermoplastic polyolefin single-ply roofing membrane. Underneath the TPO is 2" of rigid insulation and then there will be 9" more of blown-in insulation in the joist bay.


Before the composition roofing goes on, we had a ice & water shield installed as extra protection since we have a low slope roof (3:12 pitch )

And windows are starting to go in! Here is our first layer of weather protection. Tyvek DrainWrap next up 1-1/2" of rigid insulation.